Cisco CCNP Certification
(Cisco Certified Network Professional)
CCNP Certification Exam and Course Highlight |
Cisco ROUTE |
CCNP Exam Number: 642-902 |
Cisco SWITCH |
CCNP Exam Number: 642-813 |
CCNP TSHOOT |
CCNP Exam 642-832 |
|
| CCNP Certification |
£2200 |
|
CCNA Certification
+
CCNP Certification |
£2900 |
 |
|
|
End
2 End Process
|
Enrolment
Phone or In Person
Full CCNP £2200 |
|
|
|
Books
and Course
Material Included |
| |
|
|
| |
|
Hands-on
instructor
led Training on Routers and Switches for
32 Classes |
| |
|
|
| |
|
Free CCNP Mock
Exam |
| |
|
|
| |
|
Actual CCNP
Exam
done
@ BCOC
Fee not included |
| |
|
|
| |
|
CCNP Certified |
|
| Start Date | Session | Time | Duration | Observations | Enrollment |
| Sep 13 2010 | M-T-W-T | 14:00-17:30 | 30 Classes | There can be one month gap between modules |
enrol me
|
| Sep 29 2010 | Mon, Wed | 18:30-21:30 | 36 Classes | There can be one month gap between modules |
enrol me
|
| Sep 29 2010 | M-T-W-T | 14:00-17:30 | 30 Classes | There can be one month gap between modules |
enrol me
|
| Nov 03 2010 | Mon, Wed | 14:00-17:30 | 36 Classes | There can be one month gap between modules |
enrol me
|
| Nov 10 2010 | Mon, Wed | 18:30-21:30 | 30 Classes | There can be one month gap between modules |
enrol me
|
| 1 2 |
|
|
| |
|
|
Cisco CCNP Certification
CCNP Certification Course Contents
A Cisco Certified Network Professional (CCNP) will not only increase your professional capability in the networking arena but also help boost your morale, confidence and your pocketbook!
This training for this certification is taught by a certified instructor in London and spread over 32 classes. The training comprises for the following four examinations that make up the CCNP certification:
• Building Scalable Cisco Internetworks
• Building Cisco Multilayer Switched
• Implementing Secure Converged Wide Area Networks
• Optimizing Converged Cisco Networks
After the training and subsequent certification, a CCNP can build and deploy scalable routed networks, install networks using multilayer switching technologies, help improve traffic flow, reliability, redundancy, and performance for LAN/WANs, including remote access, build global intranet and troubleshooting of network environments that use Cisco routers and switches
Once you get your certification, you would be ready for roles such as Network Administrator/Technician, Level II support/systems engineer and Deployment Engineer.
Cisco ROUTE
CCNP Exam Number: 642-902
EIGRP based solution, network design and a set of requirements
• Network resources needed for implementing EIGRP on a network
• Create an EIGRP implementation plan, EIGRP verification plan
• Configure EIGRP routing
• Verify EIGRP solution was implemented, Use show and debug commands
• Document results of EIGRP implementation and verification
Multi-area OSPF Network, given a network design and a set of requirements
• Determine network resources needed for implementing OSPF on a network
• Create an OSPF implementation plan, OSPF verification plan
• Configure OSPF routing
• Verify OSPF solution was implemented properly using show and debug commands
• Document results of OSPF implementation and verification plan
eBGP based solution, given a network design and a set of requirements
• Determine network resources needed for implementing eBGP on a network
• Create an eBGP implementation plan
• Create an eBGP verification plan
• Configure eBGP routing
• Verify eBGP solution was implemented properly using show and debug commands
• Document results of eBGP implementation and verification plan
IPv6 based solution, given a network design and a set of requirements
• Determine network resources needed for implementing IPv6 on a network
• Create an IPv6 implementation plan, IPv6 verification plan
• Configure IPv6 routing
• Configure IPv6 interoperation with IPv4
• Verify IPv6 solution was implemented properly using show and debug commands
• Document results of IPv6 implementation and verification plan
IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements
• Create a redistribution implementation plan based upon the results of the redistribution analysis
• Create a redistribution verification plan
• Configure a redistribution solution
• Verify that redistribution was implemented
• Document results of a redistribution implementation and verification plan
• Identify the differences between implementing an IPv4 and IPv6 redistribution solution
Layer 3 Path Control Solution
• Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
• Create a Layer 3 path control verification plan
• Configure Layer 3 path control
• Verify that a Layer 3 path control was implemented
• Document results of a Layer 3 path control implementation and verification plan
• Implement basic teleworker and branch services
• Describe broadband technologies
• Configure basic broadband connections
• Describe basic VPN technologies
• Configure GRE
• Describe branch access technologies
Cisco SWITCH
CCNP Exam Number: 642-813
Implement VLAN based solution, given a network design and a set of requirements
• Determine network resources needed for implementing a VLAN based solution on a network
• Create a VLAN based implementation plan
• Create a VLAN based verification plan
• Configure switch-to-switch connectivity for the VLAN based solution
• Configure loop prevention for the VLAN based solution
• Configure Access Ports for the VLAN based solution
• verify the VLAN based solution was implemented properly using show and debug commands
• Document results of VLAN implementation and verification
Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
• Determine network resources needed for implementing a Security solution
• Create a implementation plan for the Security solution
• Create a verification plan for the Security solution
• Configure port security features
• Configure general switch security features
• Configure private VLANs Configure VACL and PACL
• Verify the Security based solution was implemented properly using show and debug commands
• Document results of Security implementation and verification
Implement Switch based Layer 3 services, given a network design and a set of requirements
• Determine network resources needed for implementing a Switch based Layer 3 solution
• Create an implementation plan for the Switch based Layer 3 solution
• Create a verification plan for the Switch based Layer 3 solution
• Configure routing interfaces Configure Layer 3 Security
• Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
• Document results of Switch based Layer 3 implementation and verification
Prepare infrastructure to support advanced services
• Implement a Wireless Extension of a Layer 2 solution
• Implement a VoIP support solution
• Implement video support solution
Implement High Availability, given a network design and a set of requirements
• Determine network resources needed for implementing High Availability on a network
• Create a High Availability implementation plan
• Create a High Availability verification plan
• Implement first hop redundancy protocols
• Implement switch supervisor redundancy
• Verify High Availability solution was implemented properly using show and debug commands
• Document results of High Availability implementation and verification
Cisco TSHOOT
CCNP Exam 642-832
Maintain and monitor network performance
• Develop a plan to monitor and manage a network
• Perform network monitoring using IOS tools
• Perform routine IOS device maintenance
• Isolate sub-optimal internetwork operation at the correctly defined OSI Model layer
Troubleshoot Multi Protocol system networks
• Troubleshoot EIGRP
• Troubleshoot OSPF
• Troubleshoot eBGP
• Troubleshoot routing redistribution solution
• Troubleshoot a DHCP client and server solution
• Troubleshoot NAT
• Troubleshoot first hop redundancy protocols
• Troubleshoot IPv6 routing
• Troubleshoot IPv6 and IPv4 interoperability
• Troubleshoot switch-to-switch connectivity for the VLAN based solution
• Troubleshoot loop prevention for the VLAN based solution
• Troubleshoot Access Ports for the VLAN based solution
• Troubleshoot private VLANS
• Troubleshoot port security
• Troubleshoot general switch security
• Troubleshoot VACL and PACL
• Troubleshoot switch virtual interfaces (SVIs)
• Troubleshoot switch supervisor redundancy
• Troubleshoot switch support of advanced services (i.e., Wireless, VOIP and Video)
• Troubleshoot a VoIP support solution
• Troubleshoot a video support solution
• Troubleshoot Layer 3 Security
• Troubleshoot issues related to ACLs used to secure access to Cisco routers
• Troubleshoot configuration issues related to accessing the AAA server for authentication purposes
• Troubleshoot security issues related to IOS services (i.e.,finger, NTP, HTTP, FTP, RCP etc.)
|